PROJECT
Badush-1
PROJECT CODE DAM-010
Long42.97º Lat36.47º
Start: 2035
Duration: 5
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $1,458,436,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $1,458,436,000
Governorate: NINAWA
River: Tigris
Location:
Category: Dams
Sub category: Multy Purpose Dam
Sector: Hydro electricity;
Type: Electricity
Opportunity type: Study
Source: MoWR
Source of fund:
Original source: MoWR
Implementing agency: MoWR
Status: Partially Developed
Description
At the Dam hydroscheme
Needs
Flood protection of Mosul and all the Tigris downstream and power production need
Objective
Badush Dam was originally planned and partially constructed across Tigris River downstream of the existing Mosul Dam to mitigate a catastrophic flood in the event that Mosul Dam failed and, as a secondary purpose, to produce hydroelectricity. The project is designed at a first stage layout, ready for a second stage required to stand Mosul dam break
Screening
yes