Central Area Main Drain Section-6

PROJECT CODE DR-011

Longº Latº

Start:

Duration:

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyZIs ApportenantVIs CandidateVIs ObsoleteVChecked

Project Cost (USD): $1,720,625
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $1,720,625

Governorate: BABIL

River: Euphrates

Location: ZONE 1: Central Area Main Drain

Category: Drainage Systems

Sub category: Main Drainage System

Sector: Drainage System;

Type: Infrastructures

Opportunity type: Operation & Mantainance

Source: MoWR

Source of fund: MoWR

Original source: NDS 2010-2014, pg 108

Implementing agency: MoWR

Status: Developed

Central Area Main Drain Section-6

Description

Central area main drains is located between the Tigris and Euphrates Rivers. The Main Out fall Drain (MOD) Extends from north of Baghdad to south of Basrah, (total length 565km), collecting the drainage water of Great Mussaiyab Irrigation Project. The estimated peak discharge is 15 m^3/s

Needs

According to the MoWR the Drain is completed and there is no need for changing the system. Operation and Maintenance are required. Opportunity to treat and re-use drainage water should be considered

Objective

O&M, Re-use of Drainage Water

Screening

Beneficiaries