Completion of the Thartar Head Race Canal
PROJECT CODE OTH-047
Long43.6054º Lat33.4826º
Start: 2017
Duration: 3
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $45,000,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $45,000,000
Governorate: ANBAR
River: Tharthar Euphrates Canal
Location: Tharthar
Category: Others
Sub category: Regulator
Sector: Current and future water allocation for each irrigation project;
Type: Irrigation and Drainage
Opportunity type: Construction
Source: MoWR
Source of fund: MoWR
Original source: SWLRI
Implementing agency: MoWR
Status: Under Study
Description
The completion of the Thartar Lake Head Race Canal is a critical steps for the use of the lake during very draught years. The design parameters of the Head Race canal are: Length = 1.1 km, Bottom width = 100 m, Bed level = 40.00 m (not implemented). The sill level of the Tharthar outlet Escape regulator = 37.50 m asl (lower than the design headrace bottom level of 40 m asl). According to the original design, a withdrawal of 150 m3 in emergence condition with a level in Tharthar lake of 43.70 m asl is provided. This condition is selected based on the normal level upstream Faluja Barrage (42.50 m asl), since Faluja barrage backwater is impacted by the release from Tharthar, even though in most drought years the upstream Faluja barrage can be lowered to get more water from Tharthar during the exceptional drought year.
Needs
During the 1999-2001 drought cycle the water resources management rely mainly on the carry over storage that was available in Tharthar depression at the beginning of the drought period in 1999. After the first year of drought part of the available storage was drawn from the lake so the water level in Tharthar dropped to critical level. The reason for the critical situation was attributed to incomplete construction of the ” Head race Canal ” according to the design, this come very clear when the water level drop to level that was never reached before. At that time, some urgent measure were taken but the Head Race CAnal can was never completed.
Objective
Provide secure utilization of the Thartar Storage during dorught periods. Complete the design of the HR Canal based on updated bathymertric survey of the outlet area. Excavate the bottom outlet to reach design conditions. The cost of the work are not high
Screening
Beneficiaries
Governament of Iraq