National Water Strategy Logo

TEST Website

PROJECT

East Tigris Drain Network – Southern Part

PROJECT CODE DR-003

Longº Latº

Start: 2016

Duration: 4

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyZIs ApportenantVIs CandidateVIs ObsoleteVChecked

Project Cost (USD): $160,560,861
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $160,560,861

Governorate: IRAQ

River: Tigris

Location: South Iraq

Category: Drainage Systems

Sub category: Main Drainage System

Sector: Drainage System;

Type: Infrastructures

Opportunity type: Design

Source: Water Resources Development Strategies 2010-2014. Page 28.

Source of fund: MoWR

Original source: NDS 2010-2014, pg 108

Implementing agency: MoWR

Status: Proposed/Planned

East Tigris Drain Network - Southern Part

Description

East Tigris Drain is proposed to serve the agricultural areas that fall to the east of the Tigris River in Wasit, Missan and Basrah Governorates. The Southern part of the drain network will serve the agricultural lands within following projects: Badra-Jassan and Daboni Projects (total area 114,000du), Sector 9 of Kut-Butaira project (8,000du), Nahar-Saad project (75,000du), the left side of Amara project (280,000du), in addition to the left side of Shatt Al-Arab project (110,000du). The proposed drainage plan suggested that this part of the drain will discharge the drainage water to Shatt Al-Arab to the south of Basrah city. (Note: the project is in the planning and design stage – funds allocated for studies and designs are included under the plan of the General Directorate for Engineering Designs)

Needs

At present, drainage water from numerous irrigation projects is discharged into the adjacent marshes. Gathering the drainage water into one drain and control their disposals improve the management of the irrigation network of the served projects.

Objective

This project aims to remove drainage salts from irrigation networks which are located to the east of the Tigris River within the projects which are limited between Badra –Jassan and Shatt Al-Arab irrigation projects, these projects include the following: Badra-Jassan, part of Kut-Butaira, Nahar-Saad, part of Amara and part of Shatt Al-Arab projects.

Screening

Beneficiaries