PROJECT
Khoraisan (Sareah) + Tel Asmar
PROJECT CODE IP-095
Long44.69º Lat33.69º
Start:
Duration:
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year: 2022
Reclamation end year: 2026
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $389,886,198
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD): $69,300
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD): $139,577,940
REH off farm drainage (USD):
RECL off farm drainage (USD): $97,320,594
REH off farm other (USD):
RECL off farm other (USD): $54,999,734
REH on farm irrigation (USD):
RECL on farm irrigation (USD): $30,195,858
REH on farm drainage (USD):
RECL on farm drainage (USD): $43,859,427
REH on farm other (USD):
RECL on farm other (USD): $23,863,345
Project Cost (USD): $389,886,198
Governorate: Diyala
River: Diyala
Location: On the left bank of the Dyala River
Category: Irrigation and Drainage Projects
Sub category: Major Reclamation
Sector: Current and future agriculture developments and productivity;
Type: Land reclamation, implementation/expansion of irrigation projects
Opportunity type: Construction
Source: Water Resources Development Strategies 2010-2014. Page 21
Source of fund: GoI
Original source: MoWR
Implementing agency: MoWR
Status: Proposed/Planned
Description
The ‘Khoraisan (Sareah) + Tel Asmar’ irrigation project (IP) is located in Diyala Governorate, in the Tigris River Basin.According to the Ministry of Water Resources, SWLRI Division, and after the meetings during December 2013 to February 2014, the project is ‘Planned’ to be developed over a total command or gross area of about 93.37 thousand Du (23.3425 th. Ha), corresponding to a net area of 81.9 th. Du. The suggested source of irrigation water is the Diyala River.About 93 th. Du are currently cultivated (100% of the total area to be implemented).
Needs
Irrigation and drainage infrastructure has to be build. Leaching is needed to get rid of the accumulation of salts on the soil, caused by poor drainage and inefficient on-farm irrigation methods. The water table is shallow and subsurface drains are needed. Efficient on-farm irrigation methods, suitable crop rotation system, good quality seeds and fertilizers, and technical assistance are crucial to achieve high quality and quantity production.
Objective
The objective is to achieve food self sufficiency and security and reduce poverty by reclaiming an additional area of 93.37 th.Du.
Screening
Performed under SWLRI phase 2
Beneficiaries
Execute reclamation projects will improve social conditions of lands users by improving soil quality and increase productivity.
