National Water Strategy Logo

TEST Website

PROJECT

Perform Preliminary and Detailed Design

PROJECT CODE OTH-055

Longº Latº

Start: 2015

Duration: 15

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

VIs OpportunityVIs EmergencyVIs ApportenantVIs CandidateVIs ObsoleteVChecked

Project Cost (USD): $2,500,000,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $2,500,000,000

Governorate: IRAQ

River: Tigris-Euphrates

Location: Baghdad, at the MoWR

Category: Others

Sub category:

Sector: Other issues affecting water management and sustainable development (surface and ground water).

Type: Improve Water Resources Management Practices

Opportunity type:

Source: SWLRI

Source of fund: MoWR

Original source:

Implementing agency: MoWR

Status:

Perform Preliminary and Detailed Design

Description

Prepare Preliminary and Detailed design and Tender Documents (including conductall required field surveys) to serve the Construction for all infrastructures proposed in SWLRI.

Needs

Objective

Screening

Beneficiaries