National Water Strategy Logo

TEST Website

PROJECT

Qal’at Saleh

PROJECT CODE BAR-005

Long47.28º Lat31.53º

Start: 2015

Duration: 4

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyZIs ApportenantZIs CandidateVIs ObsoleteZChecked

Project Cost (USD): $50,000,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $50,000,000

Governorate: MISSAN

River: Tigris

Location:

Category: Barrages

Sub category: Barrage

Sector: Flood control;

Type: Mantainance

Opportunity type: Operation & Mantainance

Source: MoWR

Source of fund:

Original source: MoWR

Implementing agency: MoWR

Status: Developed

Qal'at Saleh

Description

The barrage is located upstream the town of Qalaat Salih, 45 km south of Amarra City in, Missan Governorate, across Tigris River it is one of the main structures of Amara Irrigation Project, controlling the Tigris water levels for gravity irrigation.The Barrage Is a concrete Structure it includes 3 electrically operated radial steel gates each 8 m wide, capable to pass a maximum discharge of 150 m3/se at upstream water level of 6.50 masl, A Navigation Lock is provided, along with the Fish ladder which is located between the barrage and the navigation lock.The barrage construction was completed in 1978 and commissioned at the end of 1978

Needs

a qualified consultants must be employed to prepare the required monitoring instrumentation and Piezometers to be installed at each structure, and preparation of New Operation and Maintenance Manual. The Structure needs some repair works after a detailed evaluation for the requirements.A new bathymetry survey is required for the river reaches upstream and downstream the barrage to evaluate the sediment accumulation within both reaches and defining the required dredging, cleaning and/ or protection works.

Objective

The Barrage was constructed to complete Ammara Area Water Control and for Distribution of Irrigation water by Gravity the barrage helped in facilitating the fish immigration as well as the river navigation via its navigation lock

Screening

Beneficiaries