Samarra

PROJECT CODE BAR-013

Long43.86º Lat34.20º

Start: 2015

Duration: 5

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyZIs ApportenantZIs CandidateVIs ObsoleteZChecked

Project Cost (USD): $70,000,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD): $70,000,000

Governorate: SALAH AD DIN

River: Tigris

Location:

Category: Barrages

Sub category: Barrage

Sector: Flood control;

Type: Mantainance

Opportunity type: Operation & Mantainance

Source: MoWR

Source of fund: MoWR

Original source: MoWR

Implementing agency: MoWR

Status: Developed

Samarra

Description

Samarra Barrage and appurtenant structures with , Tharthar Flood Escape regulator are located close the town of Samarra on Tigris River , mainly as flood control scheme for Tigris river to protect the capital Baghdad , also to provide the irrigation water for Ishaqi Irrigation .The Tharthar Flood Escape Channel conveys the flood water from Tigris Upstream Samarra to Tharthar Natural depression creating Tharthar Lake . The Barrage is a concrete Structure, it is 252 m long includes 17 vertical lift steel gates each 12x12m with total discharge of 7000 m3/sec .The design upstream water level (Pond Level ) is 69.00 masl . Navigation Lock is not provided because Tigris river at the scheme location is not suitable for navigation , a fish ladder is provided. the construction was completed in 1956. The hydropower station is located at the right abutment of the barrage , with an intake of 14 openings each 10 m wide , it was constructed later in 1971 , it includes 3 turbines all together generates 87 MW the total length of the barrage and the hydropower station is 449 m

Needs

Detailed Inspection and Evaluation for all the Structures by qualified consultants is required , this includes , the Barrage, and Tharthar Inlet Regulator and other structures In order to define the required maintenance and /or replacement and improvement works . Previous Sedimentation surveys carried out by MoWR indicated a considerable amounts of sediments that need to be dredged from the upstream of Samarra Barrage , the estimated amount there is some 56.5 million cubic meters . the extent of Sediment removal should be based on hydraulic model tests . therefore a bathymetry survey is needed upstream and downstream the barrage and Tharthar inlet Regulator. Then a model constructed to test different solutions of river training works and the extent of sediments dredging works .

Objective

The scheme was constructed for the Flood control of Tigris river and offer safety for the downstream areas and the Capital Baghdad , this is done by diverting part of Tigris River via the constructed flood escape regulator and the flood escape