PROJECT

Thiban

PROJECT CODE REG-002

Long43.54º Lat33.37º

Start: 2015

Duration:

Rehabilitation start year:

Rehabilitation end year:

Reclamation start year:

Reclamation end year:

ZIs OpportunityVIs EmergencyZIs ApportenantVIs CandidateVIs ObsoleteZChecked

Project Cost (USD):
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):

Project Cost (USD):

Governorate: ANBAR

River: Habbaniah

Location: Anbar

Category: Regulators

Sub category: Regulator

Sector: Flood control;

Type: Infrastructures

Opportunity type: Operation & Mantainance

Source: SWLRI

Source of fund:

Original source: MoWR

Implementing agency: MoWR

Status: Developed

Thiban

Description

Needs

Detailed Inspection and Evaluation for the Structure by qualified consultants is required In order to define the required maintenance and /or replacement and improvement works. A new bathymetry survey is required for the Channel reaches upstream and downstream the barrage to evaluate the sediment accumulation within the upstream reach and the scour if any within the downstream reach , this will define the required dredging , cleaning and/ or protection works.

Objective

Thibban outlet channel was constructed, for diverting the flow from Habbaniya Lake back to Euphrates River downstream Ramadi town, the flow is controlled by Thibban Regulator.

Screening

Beneficiaries