PROJECT
West Euphrates Drain
PROJECT CODE DR-043
Longº Latº
Start: 2016
Duration: 4
Rehabilitation start year:
Rehabilitation end year:
Reclamation start year:
Reclamation end year:
Is OpportunityIs EmergencyIs ApportenantIs CandidateIs ObsoleteChecked
Project Cost (USD): $215,922,000
Partial Project Cost (USD)
REH off border irrigation (USD):
RECL off border irrigation (USD):
REH off border drainage (USD):
RECL off border drainage (USD):
REH off farm irrigation (USD):
RECL off farm irrigation (USD):
REH off farm drainage (USD):
RECL off farm drainage (USD):
REH off farm other (USD):
RECL off farm other (USD):
REH on farm irrigation (USD):
RECL on farm irrigation (USD):
REH on farm drainage (USD):
RECL on farm drainage (USD):
REH on farm other (USD):
RECL on farm other (USD):
Project Cost (USD): $215,922,000
Governorate: IRAQ
River: Euphrates
Location: South Iraq
Category: Drainage Systems
Sub category: Main Drainage System
Sector: Drainage System;
Type: Infrastructures
Opportunity type: Construction
Source: MoWR
Source of fund: MoWR
Original source: NDS 2010-2014, pg 109
Implementing agency: MoWR
Status:
Description
This is a proposed drain with 187 km long and a maximum discharge of 32 m3/s at its outfall on the MOD . This drain will serve the right side parts of Kifil-Shnafiyah and Shnafiya-Nasiriya Projects located within Najaf, Diwaniyah, Babil, Muthanna, and Thi Qar Governorates with a total area of 292 thousand dounums.
Needs
At present, drainage water from numerous irrigation projects is discharged back into the adjacent rivers, increasing their salinity. As river flows become more saline, they are less useful as source waters for irrigation and potable water supply.
Objective
Reduce the salinity level in the Euphrates River. This project aims to collect the drainage water generated from the right side parts of Kifil-Shnafiyah and Shnafiya-Nasiriya Projects that are located to the west of Euphrates River and divert it to the MOD.
